Stopped by the house today and the men were laying the ceramic tile.  This is the ensuite.  Note the outlets are moved up and covers on... they just have to fix the hole.  Also the light above where the mirror will go is in.

Tried to get a picture of the fan light that they installed in the living room but hard to see it.  Still needs a globe on it.  Forgot to look up in the master to see if the fan is in there yet or not.

This is coming in the front door... nice tile in so far

They use the garage as their work shop.  Piles of tile on the right.  The other cupboard for the kitchen is gone from there but not in the kitchen... a mystery... maybe it wasn't our cabinet after all.  Not sure where that door goes.  Maybe in the ensuite to close off the toilet or maybe it is for a different house

hallway to the bath on the right and the third bedroom straight ahead.  The bedrooms will get carpets some day.

Jim supervising ;) from the kitchen  Without the other cupboard in the kitchen yet we got tile in that area.  Maybe that is why it is not in there yet.  At least we assume there is a cupboard to go in the left then the stove.

Second Bath lighting put in but still the sink is still gone.  Lighting same as ensuite just one light less

Light put on outside of house next to garage door.  We think the hole under it is for the house numbers.

Dining and half of living room done in the tile so far.  I bet they got done today so then they can groute on Monday.

tile where fridge will go

tile in pantry

What a difference tile makes when you first walk in instead of seeing the cement floor slab